When is a simplified expert investigation the right choice?

In certain specific cases, a mini-expertise can help resolve a technical dispute more quickly and at lower cost than a classic expert investigation. That advantage only exists when the technical question is sharply defined and the simplified procedure sufficiently safeguards the rights of the defence.

In a nutshell

Mini-expertise is the common name for the limited intervention of an expert on the basis of Article 986 of the Judicial Code. The court may have an expert take part in an investigative measure to provide technical explanations, or have the expert report orally at a scheduled hearing. The formula is particularly suited to a concrete technical question that can be answered without the full course of a classic court-ordered expert investigation.

What exactly is a mini-expertise?

Article 986 of the Judicial Code does not provide for a shortened version of all the steps of a classic expert investigation. It offers the court a separate, limited investigative measure. The expert may, for example, attend a site inspection to provide technical explanations, or report orally at a hearing. A record (proces-verbaal) is drawn up of the expert’s statement.

Under Article 986 of the Judicial Code, a written report is not mandatory. In practice, the court may further define the assignment and a short note may be useful, but that is not the statutory standard that applies automatically in every case. The precise assignment and the manner in which the parties can respond to the technical findings must therefore be clearly apparent from the court’s decision and the further course of the proceedings.

Why a mini-expertise differs from a classic expert investigation

Aspect Mini-expertise Classic expert investigation
Purpose Answering a limited technical question Conducting a broader technical fact-finding investigation
Procedure Technical explanations during an investigative measure or oral report at the hearing Formal procedure under Articles 972 to 983 of the Judicial Code
Reporting Record of the statement; no mandatory full written report Preliminary opinion, parties’ observations and final report
Time and costs Generally more limited, depending on the assignment Generally higher due to the scope and the formal steps
Best use Specific and clear-cut technical issue Complex, multiple or strongly disputed technical issues

What statutory assessment does the court make?

Article 875bis of the Judicial Code requires the court to limit the investigative measure to what is sufficient to resolve the dispute. In doing so, the court takes into account the relationship between the expected costs and the stakes of the case, and gives preference to the simplest, fastest and least costly measure.

That proportionality is the strongest legal basis for requesting a mini-expertise. The argument should not, however, be confined to the assertion that a classic expert investigation is expensive. The request must also demonstrate why the technical question is sufficiently limited and why an oral explanation or a single investigative measure allows for reliable fact-finding.

How does a mini-expertise proceed?

1. Defining the question
The court specifies which technical explanation is required. A party may request the measure; the court decides whether it is sufficient and may also opt for a limited expert intervention of its own motion.

2. Appointment of the expert
The court appoints an expert and determines the concrete assignment. The assignment must remain technical: the expert advises, but does not decide the legal dispute.

3. Limited intervention
The expert attends an ordered investigative measure or reports orally at the hearing scheduled for that purpose. The expert may use documents; the relevant documents are filed with the court registry after the intervention and may be consulted by the parties or their counsel.

4. Adversarial debate
The parties must be given a genuine opportunity to take note of the technical elements and to respond to them. How this is done depends on the assignment and the course of the proceedings. In the case of a disputed or unexpected technical conclusion, a short time limit for a written response may be appropriate.

5. Record and decision
A record is drawn up of the expert’s statement. The court then assesses the technical explanation together with the other documents in the case file. The court is not bound to follow the expert’s opinion where it is contrary to its own conviction.

When is a mini-expertise appropriate?

A mini-expertise is particularly justifiable when the following features are present together:

  • the technical question is concrete and can be formulated precisely;
  • a single investigative measure or site inspection can bring the relevant facts to light;
  • the number of parties involved and technical positions remains manageable;
  • an extensive investigation with several investigative phases would be disproportionate to the stakes;
  • the parties can respond effectively to the findings within a limited procedure.

Consider, for example, a clearly defined construction defect, the technical conformity of a specific delivery or another specific finding for which the court needs specialist explanation. The value of the dispute is relevant, but not decisive: even in a case with higher stakes, a mini-expertise may be appropriate when the technical question is genuinely limited.

When is a classic expert investigation the wiser choice?

A full expert investigation is more appropriate when:

  • several defects, causes or heads of damage must be examined in relation to one another;
  • different parties each dispute their own technical responsibility;
  • measurements, destructive testing, laboratory analysis or several site inspections are required;
  • the expert must process extensive documentation or test alternative scenarios;
  • a structured written adversarial debate is essential for a reliable assessment.

In such cases, an overly limited assignment can be counterproductive. If a classic expert investigation nevertheless proves necessary after the mini-expertise, the intended time and cost savings are lost in whole or in part.

Who bears the costs?

The court determines which party or parties must bear the costs during the proceedings and in what proportion. It may also set an advance. After the expert’s statement, the court immediately assesses the fees and costs at the bottom of the record and issues an enforcement order for that amount against the designated party or parties.

That provisional payment obligation is not necessarily the final allocation of costs. In the final decision, the amounts are assessed as legal costs. The ultimate allocation follows from the decision on legal costs and is therefore not automatically identical in every case to the provisional designation.

Can the assessment of the fees be appealed?

In principle, no. In judgment no. 64/2025 of 24 April 2025, the Constitutional Court confirmed that the difference from the classic expert investigation is constitutional. In a classic expert investigation, the decision on the fees may be open to opposition or appeal on the basis of Article 991 of the Judicial Code. That exception does not apply to the assessment within a mini-expertise.

This is an important practical consideration. The simplified procedure limits procedural incidents and is generally considerably cheaper, but the decision by which the court assesses the fees at the bottom of the record cannot be challenged separately by way of opposition or appeal.

How do you substantiate a request for a mini-expertise?

A persuasive request contains at least the following elements:

  • the exact technical question to be answered, preferably in one or a few neutral sub-questions;
  • the facts and documents showing that a technical explanation is needed;
  • the reason why a single limited intervention can yield sufficiently reliable information;
  • the proportionality assessment under Article 875bis of the Judicial Code;
  • a workable arrangement for the parties to take note of the documents and to respond;
  • a clear distinction from legal qualifications that are exclusively a matter for the court.

The quality of the wording of the assignment is decisive. A vague request to investigate all causes and damage does not fit within Article 986 of the Judicial Code. A clearly formulated question, by contrast, makes it clear why a limited measure is sufficient and reduces the risk that the investigation will expand after all.

Frequently asked questions

Is a mini-expertise binding on the court?
No. The expert provides technical information. The court remains competent to assess the facts and the law and need not follow the opinion where its conviction is to the contrary.

Is a written report mandatory?
No. Article 986 of the Judicial Code provides for a technical explanation during an investigative measure or an oral report at the hearing. A record is drawn up of the statement. A short written note may be arranged in practice, but is not an automatic statutory step.

Can a party impose a mini-expertise itself?
No. A party may request the measure with reasons, but the court decides which investigative measure is sufficient. The proportionality rule of Article 875bis of the Judicial Code is an important framework for that assessment.

Is a mini-expertise only suitable for small disputes?
No. Limited financial stakes often make the formula attractive, but it is above all the nature and scope of the technical question that are decisive. A simple technical issue may also arise in a case with greater economic stakes.

Conclusion

The mini-expertise under Article 986 of the Judicial Code is not a cheap standard alternative to every expert investigation. It is a targeted procedural choice for cases in which a clearly defined technical question can be answered reliably through a limited intervention. Anyone requesting the measure should therefore not only emphasise the expected time and cost savings, but above all demonstrate that the limited assignment is sufficient and that the adversarial debate remains workable.

Contact the specialists at STUDIO | LEGALE.

Sources

Judicial Code, in particular Articles 875bis, 962, 963 and 986. Consolidated provisions on expert investigations

Constitutional Court 24 April 2025, no. 64/2025, ECLI:BE:GHCC:2025:ARR.064. Judgment in Dutch

Act of 10 April 2014, Article 7, repealing the former third paragraph of Article 986 of the Judicial Code. Publication in the Belgian Official Gazette

Last legally reviewed on 17 October 2026.

A great deal can go wrong on a construction site. Construction All Risks (CAR) insurance generally covers physical damage to, and theft of, insured property on site, without first having to establish who is liable. Not everything is covered, and the precise scope of cover is always set out in the policy. This article brings together what project owners, contractors and architects need to know, including the new Assuralia standard terms and conditions published in January 2026.

What is CAR insurance?

CAR insurance is an all-risks policy for a construction project. “All risks” means that the insured property is generally covered against all physical damage and theft, except where the policy expressly excludes cover. The policy usually consists of two sections: property insurance covering damage to property (Section 1) and optional liability insurance covering damage to third parties (Section 2).

There is no statutory obligation to take out CAR insurance. It may, however, be required by contract, usually in the specifications, and this is common in practice.

Standard terms and conditions provide a basis for these policies. In January 2026, Assuralia, the professional association of Belgian insurers, published new non-binding standard terms and conditions for CAR insurance. These reflect the rules on non-contractual liability in Book 6 of the Belgian Civil Code, which have applied since 1 January 2025. Insurers may depart from these standard terms and conditions. They are therefore a starting point, not a guarantee. Unless otherwise stated, this article takes them as its basis.

What does CAR insurance cover?

Section 1 covers physical damage to, and theft of, insured property, such as the works under construction and the materials to be incorporated into them. The policy may extend this cover to temporary works, site cabins, equipment, construction plant and the project owner’s existing property. Cover for existing property requires a condition survey carried out jointly by the parties before work begins.

Section 2 applies only if the special terms and conditions provide for it. It covers the insured parties’ non-contractual liability for bodily injury and physical damage to third-party property arising from the performance of the works. For the project owner, it may also cover liability for excessive neighbourhood nuisance. The policy determines who qualifies as a “third party”: the project owner and the participants in the project generally do not, unless a cross-liability clause treats them as third parties in relation to one another.

When and where is a construction site insured?

Cover applies to damage occurring on the construction site during the insured period. This period usually consists of two phases.

The first is the construction, erection and testing period. It begins when work starts and ends upon provisional acceptance, when the works are taken into use, or upon commissioning. A maintenance period may follow, usually lasting 12 or 24 months and ending no later than final acceptance. It often allows for the completion of minor outstanding works.

The maintenance period is not automatically insured. The parties choose whether to include it in the policy in addition to the construction, erection and testing period, and must do so expressly. Here too, a tailored approach is needed. Align the insured periods with the expected duration of the works and the construction contract, as damage occurring outside the insured period is not covered.

What is not covered?

The standard terms and conditions contain several general exclusions: damage that is normally foreseeable or inevitable, damage resulting from aggravation or recurrence, natural disasters, non-accidental pollution, asbestos, and damage caused by failure to comply with fire prevention and storage requirements. Loss of use, loss of profit and penalties for late completion are also excluded.

Section 2 also excludes damage caused by vibration, groundwater lowering, removal or weakening of support, and explosives, as well as contractual liability. Several of these exclusions can be covered through the special terms and conditions. Anyone undertaking foundation or groundworks should discuss this in advance.

One frequently misunderstood exclusion concerns errors and defects. Errors in design, calculations or plans, and inherent defects in materials, are not entirely excluded. Only the component directly affected by the error or defect — the “faulty part” — is excluded. Accidental physical damage that this causes to other insured property or other parts of the works remains covered. For example, a concrete beam collapses because of an error in the structural calculations and damages an already installed roof as it falls. The beam itself is not covered, but the damage to the roof generally is. The insurance therefore does not pay to rectify the error itself, but does cover the resulting physical damage. The special terms and conditions may depart from this arrangement.

The legal default is that the insured’s gross negligence is covered. It may be excluded only for specific cases expressly and exhaustively defined in the policy. Only intentional misconduct may be excluded in full and in general terms. For example, a clause excluding a claim because accepted standards of workmanship were not followed applies only to breaches that were tolerated or of which those responsible for the technical management of the site should have been aware. An insurer’s refusal to provide cover is therefore not always the final word.

Who is insured?

The project owner, main contractor, subcontractor, architect or another participant in the construction project may take out the policy, and all project participants may be included as insured parties. This reduces the risk of gaps in cover, but the policy must identify each participant’s insured capacity and activities. Where insurance is taken out on behalf of others, the insured parties may claim cover themselves.

How quickly are claims paid?

For damage to insured property, there is no need first to establish who is liable. This is the main advantage of property insurance: work on site need not stop until a liability dispute has been resolved. It does not mean, however, that payment is automatic or immediate. The insurer first examines whether the claim is covered, the extent of the damage, the declared values and the applicable deductible.

What should you do when damage occurs?

Efficient claims handling starts with proper notification. Notify the insurer immediately. Take reasonable steps to limit the damage, do not alter the damaged property until the cause has been established, and do not admit liability. Reasonable and urgent measures to prevent or limit damage are covered as loss prevention and mitigation expenses, even if they prove unsuccessful. Ordinary improvements or adjustments to the execution of the works do not fall within this cover.

Would you like a claim or policy reviewed?

A carefully arranged CAR policy can limit the financial consequences of construction site damage. However, the precise scope of cover depends on the general and special terms and conditions, the declared values, the exclusions and the deductibles. Has damage occurred, or would you like a policy assessed? Contact the specialists at STUDIO | LEGALE at [email protected].

Authors: Mr. Joost PEETERS and Mr. Marie DE SCHEPPER

Legal sources

Hoofdwebsite Contact
make appointment upload






      GDPR proof area
      upload uw documenten





      drag your documents here or choose file


      drag your correspondence here or choose file











        Benelux (€... )EU (€... )International (price on request)

        By submitting this application, you expressly agree to our General Terms and Conditions and confirm that you have carefully read our Privacy Policy. Sending this application is considered as order confirmation.
        error: Deze inhoud is auteursrechtelijk beschermd. Kopiëren, reproduceren of hergebruiken zonder voorafgaande schriftelijke toestemming is niet toegestaan.